CALENDARIZAÇÃO | SCHEDULE

PR – PROCESSO|PROCESS; GR – GRUPO|GROUP

3D.E_01

CONFERÊNCIAS | CONFERENCES (9.00 – 11.00) , (18.00 – 20.00)

6 de Abril 2013 | 6th April 2013

AUDITÓRIO B104

PALESTRA CONVIDADO ESPECIAL | SPECIAL GUEST CONFERENCE

Philippe Block, BLOCK Research Group, ETH Zurich,

“New masonry shells: Learning from the Gothic Master Builders”

MINI PALESTRAS | SHORT CONFERENCES

Arquitecturas de Terra – passado, presente e futuro | Earth Architecture – past, present and future

Miguel Mendes, Eduardo Carvalho e Patrícia Lourenço

A terra-matéria-prima de arquitectura | The earth-raw material of architecture

Idália Gomes, Paulina Faria e Vasco Rato

Adobe o novo Paradigma? | Adobe A New Paradigm?

António Abel e João Rocha

Processos Generativos | Generative Processes

Brimet Silva

Mesa Redonda com os participantes do workshop | Roundtable with the workshop participants

3D.E_01

FORMAÇÃO E CONCEPÇÃO | TRAINING AND CONCEPTION (10.30H)

6 a 7 Abril | 6th to 7th April 2013

VFabLab

Sáb – 06.04.2013 Dom – 07.04.2013
09.00 – 11.00 MINI PALESTRAS | SHORT CONFERENCES Arquitecturas de Terra – passado, presente e futuro | Earth Architecture – past, present and future
A terra-matéria-prima de arquitectura | The earth-raw material of architecture
Adobe o novo Paradigma? | Adobe A New Paradigm?
Processos Generativos | Generative Processes
Breve introdução ao plug-in Grasshopper – Interface e workflow | Brief introduction to Grasshopper
plug-in-Interface and workflowEstratégias de concepção formal e estrutural – Image Sampler | Formal design and structural strategies-
Image Sampler

Estratégias de concepção formal e estrutural

Curve attractors and vector fields | Formal design and
structural strategies-Curve attractors and vector fields

Parametric patterns | Formal design strategies and
structural-Parametric patterns

Tessellation | Formal design and structural strategies-
Tessellation

11.00 – 11.30 Coffee break
11.30 – 13.00 INTRODUÇÃO CdT | CdT INTRODUTION
Módulo Prático – Terra: matéria | practice module – earth: matter
Testes práticos – caracterização da terra | practical tests – earth characterizationinstalar software | install software
13.00 – 14.00 almoço | lunch almoço | lunch
14.00 – 18.00 Introdução e apresentação | Introduction and presentationProcessos generativos: Morfogénese e tectónica | Generative processes: Morphogenesis and tectonics

Introdução à modelação tridimensional – Estratégias elementares, teoria e prática | Introduction to
three-dimensional modeling-basic Strategies, theory and practice

Introdução aos processos generativos, paramétrico e algorítmico – Simplexity, trial error, form Finding,
top-down e bottom-up | Introduction to parametric and algorithmic, generative processes-Bakary_manneh,
trial error, form Finding, top-down and bottom-up

Modelação tridimensional com o software Rhino3D – Princípios básicos, interface e workflow | Threedimensional
modeling with the Rhino3D-basics, software interface and workflow

Trabalho de grupo – Procura e materialização de uma proposta modular baseada num padrão paramétrico
– Morfogénese e tectónica | Group work – demand and materialization of a modular proposal based
on a parametric-pattern Morphogenesis and tectonics

sintese e discussão | conclusions and brainstorming

18.00 – 20.00 Palestra | conference Philippe Block – BLOCK Research Group

3D.E_02

PROCESSOS E PROTOTIPAGEM | PROCESSES AND PROTOTYTING (24.00H)

12 a 14 Abril 2013 | 12th to 14th April 2013

VFabLab

Sxta – 12.04 Sáb – 13.04 Dom – 14.04
09.00 – 13.00 processes_
DRY – PR1/GR1: cad/CAM Rhino+Aspire | Rhino+Aspire CAD/CAM
Compreensão das potencialidades da prototipagem | Understanding the potential of
prototyping
MOLD – PR2/GR2: Desenho da cofragem – o negativo dos tijolos desenhados anteriormente
| Formwork design – the negative of the previously drawn bricks
PLASTIC – PR3/GR3: Compreensão das cofragens para as realizar – madeira/cola/pregos |
Understanding of structural steelwork for the perform-glue wood 
PART – PR4/GR4: PROTOTIPAGEM em CNC – XPS | xps cnc prtotyping
processes_
DRY – PR1/GR1: PROTOTIPAGEM | prototyping
MOLD – PR2/GR2: Terminar cofragens – Óleo de Linhaça | Finish shuttering-linseed oil
PLASTIC – PR3/GR3: Óleo de linhaça e Fazer Terra | Linseed oil and Make Earth

PART – PR4/GR4: Óleo de linhaça e Fazer Terra | Linseed oil and Make Earth

processes_
DRY – PR1/GR1: Acabamento e montagem | Finishing and Assembly
MOLD – PR2/GR2: Acabamento | Finishing
PLASTIC – PR3/GR3: prototipagem | prototyping
PART – PR4/GR4: Acabamento | Finishing
13.00 – 14.00 Lunch Time! Lunch Time! Lunch Time!
14.00 – 18.00 processes_
DRY – PR1/GR1: Finalização da preparação dos desenhos para a prototipagem| Preparation of designs for prototyping
MOLD – PR2/GR2: PROTOTIPAGEM em CNC – XPS | xps cnc prtotyping
PLASTIC – PR3/GR3: Realização das cofragens | Realization of structural steelwork
PART – PR4/GR4: Organização dos moldes – óleo de linhaça | Organizing and cleaning of
moulds-linseed oil
processes_
DRY – PR1/GR1: PROTOTIPAGEM e Acompanhamento dos restantes trabalhos | PROTOTYPING
and Monitoring of the remaining works
MOLD – PR2/GR2: Fazer Terra e Enchimento dos moldes | Do Earth and Filling of molds
PLASTIC – PR3/GR3: Fazer Terra | Do Earth
PART – PR4/GR4: Fazer Terra e Enchimento dos moldes | Do Earth and Filling of molds
processes_
DRY – PR1/GR1; MOLD – PR2/GR2; PART – PR4/GR4:
concepção de painel a1 sintese do trabalho realizado | Panel a1 design
synthesis of the performed work
PLASTIC – PR3/GR3: prototipagem e concepção de painel a1 sintese do trabalho realizado
| prototyping and Panel a1 design synthesis of the performed work

3D.E_intervalo | range

15 de abril a 2 de maio | from april 15th to 2nd may

15 de ABRIL – 21 de ABRIL | april 15th – april 21th
SECAGEM DE PROTÓTIPOS | DRYING OF PROTOTYPES

22 de ABRIL – ABRIL 22th
VOTAÇÃO ON LINE | online votation

23 de ABRIL – 24 de abril | ABRIL 23th – april 24th
PROToTIPAGEM DA SOLUÇÃO FINAL | FINAL SOLUTION PROTOTYPING

24 de abril – 3 de maio | april 24th – may 3rd
secagem | drying

3D.E_03

CONSTRUÇÃO 1:1 | CONSTRUCTION 1:1 (24 h)

3 a 5 Maio 2013 | 3rd to 5th May 2013

VFabLab

Sxta – 03.05 Sáb – 04.05 Dom – 05.05
09.00 – 13.00 Descofragem e ORGANIZAÇÃO DOS BLOCOS TRANSPORTE PARA O LOCAL
MONTAGEM
MONTAGEM
13.00 – 14.00 Lunch Time! Lunch Time! Lunch Time!
14.00 – 18.00 TRANSPORTE PARA O LOCAL
MONTAGEM
TRANSPORTE PARA O LOCAL
MONTAGEM
MONTAGEM
ENCERRAMENTO

DESCRIÇÃO DOS PROCESSOS | DESCRIPTION OF THE PROCESSES

PROCESSO/GRUPO1 – SECO | PROCESS1/GROUP1-DRY

Modelação em CAD | CAD Modelling (Rhino + Grasshoper);

Construção/Montagem das Cofragens – madeira, prego, martelo | Formwork construction/assembly – wood, pin, tup;

Mistura da terra | Earth Mixture;

Encher molde | Fill mold;

Tempo de Secagem | Drying time;

Prototipagem em CNC | CNC prototyping.

PROCESSO2/GRUPO2 – MOLDE | PROCESS2/GROUP2-MOLD

Modelação CAD | CAD Modelling (Rhino + Grasshoper);

Prototipagem em CNC dos moldes em XPS (100mm);

Mistura da terra | Earth Mixture;

Montagem dos Moldes | Mold Assembly;

Enchimento dos Moldes | Mold Fill;

Secagem | Drying.

PROCESSO3/GRUPO3 – PLÁSTICO | PROCESS3/GROUP3-PLASTIC

Modelação CAD | CAD Modelling (Rhino + Grasshoper);

Construção/Montagem das Cofragens – madeira, prego, martelo | Formwork construction/assembly – wood, pin, tup;

Mistura da terra | Earth Mixture;

Preparação das Cofragens | Formwork preparation;

Enchimento das Cofragens com Terra | Formwork earth fill;

Espera do tempo de secagem ‘ideal’ | ‘Ideal’ drying time;

Prototipagem em CNC da Terra | Earth CNC prototyping.

PROCESSO4/GRUPO4 – PEÇA | PROCESS4/GROUP4-PART

Modelação CAD | CAD Modelling (Rhino + Grasshoper);

Prototipagem em CNC dos moldes em XPS (100mm) | XPS (100mm) mold CNC prototyping;

Mistura da terra | Earth Mixture;

Montagem dos Moldes | Mold assembly;

Enchimento dos Moldes | Mold Fill;

Secagem | Drying.

LÍDERES DE PROJETO | TEAM LEADERS

VFabLab (VFL); Centro da Terra (CdT); Faculdade de Ciências e Tecnologia (FCT); Universidade de Évora (UE)

PROCESSO|PROCESS1 – EDUARDO CARVALHO (CdT) / JOÃO ROCHA (UE)
PROCESSO|PROCESS2 – ALEXANDRA PAIO (VFL)/ ANTÓNIO BORGES ABEL (UE)
PROCESSO|PROCESS3 – VASCO MOREIRA RATO (VFL)/PAULINA FARIA (FCT)
PROCESSO|PROCESS4 – MIGUEL MENDES (CdT)/IDÁLIA GOMES (CdT)
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: